PROJECT DETAILS

The replacement of the high school’s natural turf baseball field marked a pivotal moment in the school’s commitment to restoring and enhancing its athletic facilities after severe flood damage. Recognizing the need for a more resilient solution, the District opted to replace the natural turf with a durable synthetic infield and outfield, supported by advanced irrigation and drainage systems. The WestbergWhite Architecture team worked closely with District officials to address the implementation of a stormwater drainage system that reroutes water around the field through a combination of open-air channels and underground culverts. In addition to the field improvements, new structures were constructed, including masonry dugouts, a team room, and storage facilities, all designed to replace those lost in the flood. Elevated aluminum bleachers were installed atop a concrete platform, with low masonry walls creating a perimeter barrier to protect against future flooding. The project also included the installation of chain link and ball control fencing up to 25 feet in height, a new fenced enclosure for the batting cage, and updated field lighting. This comprehensive restoration not only revitalized the baseball field but also ensured it would serve the school community for years to come, withstanding the elements and providing a safe, modern space for athletes and spectators alike.

Location

Lake Elsinore, CA

Area

310’ right & left field depth 360’ center field depth

Delivery Method

Design-Bid-Build

Market Sector

K-12, Sport

SERVICES PROVIDED

Design through Construction Administration

PROJECT TYPE

Athletic Facility

PROGRAMMING FEATURES
  • Replacement of an existing High School natural turf baseball field and facilities 
  • Synthetic infield and outfield with supporting irrigation and drainage systems
  • New Press Box
  • New structures for masonry dug-outs, a team room, and storage
  • New elevated 245 spectator aluminum bleachers set atop an elevated concrete platform
  • Partial open-air and underground enclosed culvert system
  • New chain link and ball control fencing  up to 25 ft. in height
  • New fenced enclosure batting cage and new field lighting