Two-Story Central Plant

Rancho Santiago Community College District - Santa Ana College

logo-bg-righ
PROJECT DETAILS

The New Santa Ana Central Plant project was initiated by the District to upgrade the existing energy systems and improve overall efficiency across campus buildings. Providing our architectural expertise, the goal was to replace outdated rooftop systems with a new, energy-efficient central plant that could accommodate future growth and additional mechanical equipment. Situated near the baseball fields and tennis court area, the building was designed with a contemporary aesthetic to seamlessly blend in with the surrounding academic structures. The scope of work involved the design and construction of the central plant, ensuring optimal performance and integration with existing and future campus infrastructure.

Location

Santa Ana, CA

Area

23,685 SF

Delivery Method

CM/General Contractor

Market Sector

Higher Education

logo-bg-righ
SERVICES PROVIDED

Design through construction administration

PROJECT TYPE

Higher education support facility

PROGRAMMING FEATURES
  • New 2-story central plant with chilled water system to eight existing campus buildings and four future buildings
  • New maintenance office
  • New second-floor procurement storage with freight elevator and first-floor athletic equipment storage
  • New public restrooms for adjacent campus baseball and softball field facilities
  • The system is designed to improve the energy efficiency of the campus
  • The chilled water system connected to the campus-wide distribution system was completed under a separate project scope of work with connection to 8 existing buildings and future points of connection